Copy

In This Edition:  Klingner Anniversary Party, Bracewell Stadium Video, Roseville Water Tower Story, We're HIRING

View this email in your browser
KLINGNER & ASSOCIATES IS PROUD TO CELEBRATE 110 YEARS OF SERVING THE TRI-STATE AREA
Website
LinkedIn
YouTube
Facebook
Twitter

Project Spotlight:
Bracewell Stadium

AN IOWA HIGH SCHOOL STADIUM, IN A LEAGUE OF IT'S OWN

Bracewell Stadium
The Professional Staff of Klingner’s Burlington Branch Office provided architectural, structural, mechanical, electrical, plumbing, civil and surveying engineering services to Burlington Community School District and the Purple and Grey Foundation in the renovation of historic Bracewell Stadium. 

Bracewell Stadium was the first stadium west of the Mississippi equipped with lighting for the playing of night games and is now is the first high school stadium in the country equipped with LED lighting. A new accessible parking lot and press box with private coaching suites and a hospitality area were added to the west side of the stadium. Spectators now enjoy direct access to new toilet rooms, concession stand with live game feed video monitors and a VIP seating area. New entrances to the north and south not only welcome visitors to the stadium but provide security and crowd control for those entering and exiting. 

Once inside the stadium spectators are treated to beautifully landscaped areas, paved walkways, retaining walls and water feature with integrated lighting. They also enjoy the new state-of-art digital score board with video screen. Players now enjoy the artificial playing surface and warm-up area enhanced with the school colors and logo adorning the field sized for high school football and NCAA soccer. The project has been well received by the community and has already garnered the attention of other school districts and leading to a similar renovations in the near future.
The Burlington Klingner Team

Branch Manager: Bryan Bross
"The Head Coach" 

Survey Department: Jeff Miller
"The Sideline Ref."
 

Verifying boundaries, locating underground utilities.

Architecture Department: Chuck Ytzen
"The Quarterback"
 
Coordinating the design team.

Water Resources / Environmental: Will Ettema
"The Waterboy"
 
Design to manage the community's water resources.

Material Testing: Jim Hawkins
"The Head Ref."  
Making sure the field is following the rules.


Mechanical Design - Tony Diewold
"The Unsung Hero"
  
Mechanical, Electrical, and Plumbing Design.


Civil Engineering - Steve Hartman
"The Hand-Off" 
 
He is ready to take the ball and run with it.

YOU'RE INVITED!
Join Us In Celebration of 110 Years

SAVE THE DATE:
THURSDAY, NOVEMBER 12TH

Look for the E-VITE Invitation with convenient RSVP Link,
coming soon to your email inbox!!

Staff News


 LEE: Recently, Mark Lee,  Senior Engineer of  Klingner's Galesburg office,  was notified that his
 publication submitted,  "Utility Management  System Cost and Time  Benefits and Implications from the Local Agency Perspective" to ASCE, has officially been published in the ASCE Journal of Infrastructure Systems.

 
The physical copy has yet to come out, but the paper is published on their website, and the abstract can be accessed using the following link: http://dx.doi.org/10.1061/(ASCE)IS.1943-555X.0000269  

 

 VANDENBOOM: Klingner  is proud to welcome Laurie  VandenBoom, as the  Business Manager in the  Quincy Office.  Laurie has a  Master's Degree in  Business.  Prior to  accepting this position, she served as Assistant Risk Manager, Insurance Administrator and Workers Compensation Administrator. Welcome Laurie!
 

Hannibal LaGrange University Dedicates the Carroll Science Center



On Friday, October 16th, Hannibal LaGrange University dedicated their new science/nursing building, among a large crowd of supporters.  

Klingner Architectural Group was proud to design this 40,000 square foot, $7 million building, that houses a 58-seat computer lab/classroom, five science labs, two nursing skills labs, two nursing lab hospital rooms, a nursing library, nine multimedia classrooms, a spacious lobby, five student lounges, two conference rooms, two group study rooms, two individual study rooms, and 20 faculty offices. More than 500 individual gifts helped to fund the building.  Read the entire article: 

http://www.hannibal.net/article/20151016/NEWS/151019217


 

Klingner Water Engineers Help Enhance Roseville Water Tower


Recently, Klingner & Associates was featured in Induron Protective Coatings Blogspot, on the beautification efforts of the Roseville Water Tower, in Roseville, IL.  To read this interesting story on how the design of the water tower came to be, click on the photo below.

 


Klingner Is Hiring!

 
Apply to join our team today. 

Due to Klingner's constant and ongoing project opportunities,
our Firm is always adding talent to our qualified team of professionals.  Visit our employment page today to see how
you may be able to join one of the strongest Firms in the
tri-state area:
http://www.klingner.com/employment.php




 
Copyright © 2015 Klingner & Associates, PC,
All rights reserved.



unsubscribe from this list    update subscription preferences 

Email Marketing Powered by Mailchimp