The cooperation between ERIGrid and ELECTRA IRP was highlighted with regards to holistic power system validation as the WoC approach and similar concepts can be validated using the procedures developed in ERIGrid.
Photo: Panel discussion on the future of ELECTRA’s Web-of-Cell concept at the final event in Milan (IT)