GASHOLDER SPECIAL SIX: BETHNAL GREEN (amended)

So far, 1475 people have signed the EEWG petition to St William Homes, for which many thanks. However, we need many more signatures.

REASONS FOR SIGNING THE EAST END WATERWAY PETITION TO ST WILLIAM HOMES

No. 2 Gasholder at Bethnal Green, built 1865-66

No 5 Bethnal Green

Photographed by Malcolm Tucker in 1973 - click for large version

This is the second-oldest surviving gasholder in the world and we want its columnar guide frame (which is the earliest and most ‘classical’ surviving example of its type in the world) retained and conserved in situ on its original in-ground brick tank (being retained by St William) for reuse as a ‘gasholder park’.

  • in-situ conservation would cost less than off-site conservation, which could also damage the cast-iron parts of the frame and require the joints in the columns to be reinforced with mild steel bands *

  • in-situ conservation on the original in-ground brick tank (with the top of the tank wall exposed between the bases of the columns) would retain the structural integrity and significance of the historic gasholder, and the open appearance of the columnar guide frame would ensure that the gasholder continues to make a full “positive contribution” to the Regent’s Canal Conservation Area

  • grassed open space within the open columnar guide frame would respect the gasholder and would extend and enhance the proposed central public open space by linking it with the Regent’s Canal

No. 5 Gasholder at Bethnal Green, built 1888-89

No 5 Bethnal Green

Photographed by The Gentle Author in 2014 - click for large version

This is one of the few surviving gasholders built by the world-renowned local firm of Samuel Cutler & Sons of Millwall and we want its lattice guide frame (which is as built 1888-89, whereas the Grade-II-listed 1879 gasholder at Kennington was extensively and unsympathetically altered 1890-1891) retained and conserved in situ on its original in-ground concrete tank (being retained by St William) for St William’s two proposed blocks (to be built inside the retained and conserved guide frame, like the Alliance gasholder at Dublin).

  • in-situ conservation would cost less than off-site conservation, which could also require reinforcement before or during re-erection *

  • in-situ conservation on the original in-ground concrete tank (with the top of the tank wall exposed between the bases of the standards) would retain the structural integrity and significance of the historic gasholder, and well-designed blocks (to enhance the elegant appearance of the lattice guide frame and create maximum visibility between and above the two blocks) are needed to ensure that the gasholder makes the best possible “positive contribution” to the Regent’s Canal Conservation Area

NB The insurance and redecoration costs for both conserved gasholder guide frames (and their relocated roller carriages) could be included in the annual service charges applied to the non-affordable flats.

The No.2 and No. 5 gasholders at Bethnal Green are the only surviving in-situ historic gasholders on the Regent’s Canal: the so-called ‘gasholders’ at King’s Cross are just re-located gasholder guide frames erected on new pile-driven foundations around new blocks of flats.

The No. 2 and No. 5 gasholders are also the only surviving adjacent gasholders in London and possibly England with excellent and complementary examples of the two main types of 19th century gasholder guide frame.

Given the way that the few listed gasholders are being reduced to relocated guide frames on new foundations, and the ongoing disappearance of non-listed historic gasholders, the No. 2 and No. 5 at Bethnal Green are likely to become the only surviving in-situ historic gasholders in London, which was the birthplace of the gas industry.

Sign the Petition and help save the Bethnal Green Gasholders as a memorial to the London Gas Industry, with reuses which would "sustain and enhance (their) significance" and "be consistent with their (long term) conservation" (National Planning Policy Framework para 185a)

East End Waterway Group Petition Supported By: Friends Of The Regent’s Canal, Regent’s Network, East London History Society, Hackney Society, East End Preservation Society, Save Britain’s Heritage And The Victorian Society.

Go and sign the petition - click here

* For information on the in-situ conservation costs (or repair costs) see page 11 and Appendices F and G in the Feasibility Study (Revision F) prepared by Paul Latham of The Regeneration Practice. The more expensive and less conservative method of off-site conservation for the so-called ‘retention’ of the gasholders would, according to St William, cost “in the region of £10m per gasholder” (LBTH response to Main Matter 10 August 2018).

Actual costs for the development at Bethnal Green have still to be worked out and much depends on Craddy Pitchers Ltd report on the condition of the two guide frames. They are consulting engineers (previously involved in the off-site conservation of gasholder guide frames at King’s Cross and currently at Kennington), and EEWG fears that their forthcoming report for Bethnal Green will serve as a justification for the unnecessary and expensive off-site conservation of the No.5 guide frame and the demolition of the No.2 guide frame.

The relatively low costs for in-situ conservation and related works for a ‘gasholder park’ inside the No.2 guide frame (together with the higher costs for in-situ conservation of the No.5 guide frame and related works for blocks of flats inside the No.5 guide frame) should be covered by market sales of flats in the blocks built inside the No.5 guide frame.

Gasholder

The cross-sectional drawing shows the three main parts of a traditional gasholder (in-ground tank, bell and guide frame, which are mentioned in the petition and the reasons); and indicates the up and down movements of the bell as it filled with gas and emptied as the gas was forced and drawn into the gas mains.

There were two adjacent vertical pipes (between the in-ground tank wall and the lowered bell) with open ends above the level of the water in the in-ground tank. Gas was pumped via the inlet pipe into the domed part of the bell’s inner telescopic lift, causing the lift to rise; and the stored gas passed into the gas mains via the outlet pipe.

The up and down movements of the bell were guided and supported by the guide frame with its guide rails on the insides of the columns (or the standards in a lattice girder guide frame, like the No. 5 at Bethnal Green). The rim of the domed part of the bell’s inner telescopic lift had roller carriages with double-flanged rollers which ran up and down the guide rails; and there were flanged rollers on the sides of the lifts below the carriage rollers.

Tom Ridge

new eewg logo East End Waterway Group
PATRON JIM FITZPATRICK MP POPLAR AND LIMEHOUSE
Local residents, schools, community groups, amenity societies and businesses working with the Canal & River Trust, Tower Hamlets Council and others for the protection and beneficial use of the six mile waterway ‘ring’, its historic buildings, structures and habitats.
Copyright © 2019 EAST END WATERWAY GROUP, All rights reserved.


unsubscribe from this list    update subscription preferences 

Email Marketing Powered by Mailchimp