Overall construction work 65% (100%).
- Working on roof structure (100%).
- Tiling work in bathroom.
- Tiling corridor.
- Wall behind building (done).
- Aluminum fence install (done).
- Pouring the concrete for the pool (done).
- Outdoor painting.
- Indoor painting.
- Start swimming pool system.
|
|