Monday, October 21, through Thursday, October 24
Nightly form 8pm to 5am
- Gateway Boulevard North will be closed to all traffic between US 62 (Paisano Drive) and SH 20 (Alameda Avenue)
- DETOUR: Access northbound US 54 via I-110.
Crews will be working on a bridge deck.
|
|
Long-Term Closures Which Will Remain in Place Next Week
- Ramps F and G which connect I-10 to Juárez at the Spaghetti Bowl remain detoured through northbound US 54 to Pershing Drive until further notice.
- Ramp T which connects Gateway Boulevard North to northbound US 54 north of US 62 (Paisano Drive) remains closed until further notice.
- Alternating complete closures of Durazno Avenue, Rosa Avenue and Uva Street.
- Both turnarounds under US 54 at US 62 (Paisano Drive) remain closed until further notice.
- Intermittent lane closures will be in place on US 54 between Loop 375 and Spur 601.
- Intermittent lane closures will be in place on Gateway Boulevard East between Piedras Street and US 62/180 (Paisano Drive).
- Intermittent lane closures will be in place on Gateway Boulevard West between Boone Street and Palm Street.
- Lane closures are in place on eastbound and westbound SH 20 (Alameda Avenue) at US 54 until further notice.
- Lane closures are in place on eastbound and westbound US 62 (Paisano Drive) between I-110 and US 54 until further notice.
- Lane closures are in place on Ramp D which connects southbound US 54 to eastbound I-10 until further notice.
- Lane closures are in place on Gateway Boulevard South between Findley Avenue and US 62 (Paisano Drive) until further notice.
|
|
About the I-10 Connect Project
The I-10 Connect project is at the intersection of Interstate 10 and US 54 in El Paso County. The project extends from I-10 to Loop 375 (Cesar Chávez Border Highway) and provides access to the Bridge of the Americas (BOTA) via I-110. The $96 million project includes the construction of four new direct connectors, a full reconstruction of the I-110/US 62 (Paisano Drive) interchange, and removes exit ramps from US 62 to I-110.
I-10 Connect will improve connectivity between I-10 and Loop 375, also providing an alternate route to I-10. It started February 19, 2019, and is expected to be complete in less than three years.
For more information, visit I10ConnectElPaso.com; you can also follow @I10ConnectEP on Facebook and Twitter.
|
|
RECORDATORIO
Cierran SH 20 (Alameda Ave.) por 46-horas por la demolición parcial de las rampas
|
|
EL PASO, Texas — Para construir nuevas rampas hacia Cd. Juárez como parte del Proyecto I-10 Connect, hay que eliminar partes de las rampas existentes. Como resultado de la demolición de algunas partes de una rampa, SH 20 (Alameda Avenue) cierra para todos los peatones, ciclistas, y automovilistas en US 54 por aproximadamente 46 horas este fin de semana.
|
|
7am el sabado 19 de octubre hasta
5am el lunes 21 de octubre
- SH 20 (Alameda Avenue) cierra al tráfico a la altura de US 54.
- DESVIACIONES: : El tráfico del Este dobla a la izquierda en Circuito 478 (Copia Street), derecha en Gateway Boulevard Este, y derecha en Calle Raynolds. El tráfico del Oeste toma US 62 (Paisano Drive) Oeste y dobla a la derecha en Circuito 478 (Copia Street).
- AVISO: Alameda permanece abierto solamente para tráfico local excepto en el área inmediatamente debajo de US 54.
- A los automovilistas, peatones, y ciclistas, no se les permitirá cruzar debajo de US 54 en ningún momento durante este cierre.
Cuadrillas derrumban partes de una rampa existente.
|
|
Lunes 21 hasta jueves 24 de octubre
Cada noche de 8pm a 5am
- Gateway Boulevard Norte cierra al tráfico entre US 62 (Paisano Drive) y SH 20 (Alameda Avenue).
- DESVIACIÓN: El tráfico del Norte llega al US 54 vía I-110.
Cuadrillas trabajan en una losa de concreto para un puente.
|
|
Impactos al tráfico que continúan durante la semana que viene:
- Las Rampas F y G que conectan I-10 a Cd. Juárez sobre Spaghetti Bowl permanecen desviados por US 54 Norte hacia Pershing Drive hasta nuevo aviso.
- La Rampa F que conecta I-10 Oeste a Cd. Juárez permanece cerrada para todo tráfico hasta nuevo aviso.
- Cierres intermitentes de carriles en US 54 entre Circuito 375 y Spur 601.
- Rotando cierres completos de Avenidas Durazno y Rosa entre Calles Bowie y Uva.
- La Rampa T que conecta Gateway Norte Boulevard a US-54 Norte al norte de US 62 (Paisano) permanecerá cerrada hasta nuevo aviso
- Los dos retornos en US-62 (Paisano Drive) por debajo del US 54 permanecerán cerrados hasta nuevo aviso
- Cierres intermitentes de carriles en Gateway Boulevard Este entre Piedras y 62/180 (Paisano Drive).
- Cierres intermitentes de carriles en Gateway Boulevard Oeste entre Calles Boone y Palm.
- Cierres de carriles en efecto en ambos sentidos de SH 20 (Alameda Avenue) sobre US 54 hasta nuevo aviso
- Cierres de carriles en efecto ambos sentidos de US 62 (Paisano Drive) entre I-110 y US 54 hasta nuevo aviso.
- Cierres de carriles en efecto ambos sentidos de US 54 entre Circuito 375 y Spur 601 hasta nuevo aviso Cierres de carriles en efecto en Rampa D que conecta US 54 Sur a I-10 Este hasta nuevo aviso
- Cierres intermitentes de carriles en Gateway Boulevard Sur entre Findley Avenue y US 62 (Paisano. Drive).
|
|
SOBRE I-10 CONNECT
El Proyecto "I-10 Connect" se encuentra en la intersección de la autopista interestatal I-10 y la carretera US 54 en el Condado de El Paso. El proyecto se extiende del I-10 al Circuito 375 (Cesar Chávez Border Highway). El proyecto da acceso al Puente Internacional de las Américas (BOTA por sus siglas en inglés) vía la autopista interestatal I-110. El proyecto de $96 millones incluye la construcción de cuatro puentes interconectores, una reconstrucción completa de la intersección I-110/US 62 (Paisano Drive), y remueve las rampas de salida del US 62 al I-110. La intención de este proyecto es facilitar a los automovilistas el usar el Circuito 375 como ruta alterna al I-10. El proyecto I-10 Connect inició su obra el 19 de febrero de 2019, y se estima que concluya en menos de tres años. Para más información, visite I10ConnectElPaso.com; y también @I10ConnectEP en Facebook y Twitter.
|
|
|
|