Overall construction work 87% completed.
- Working on roof structure (100%).
- Waiting for electric work.
- Waiting for install doors and windows.
- Painting work.
- Tiling work in the pool.
- Cleaning around the building.
- Put the waste water pipe behind the building.
|
|