Environmental Assessment Notice of Availability
RapidRide Roosevelt Project (RapidRide J Line)
The Seattle Department of Transportation (SDOT) and Federal Transit Administration (FTA) released the RapidRide Roosevelt Environmental Assessment (EA) on January 8, 2020 for public review and comment. The EA has been prepared pursuant to the National Environmental Policy Act (NEPA) (42 U.S.C. 4231 et seq.). The public is also invited to provide comments on the Section 4(f) park and historic resource impacts at NE Ravenna Blvd described in the Environmental Assessment.

Comments on the Environmental Assessment and Section 4(f) Analysis must be postmarked or submitted online by 5 PM on Friday, February 14, 2020.

If no significant issues are identified during the comment period, FTA would make the determination to issue a Finding of No Significant Impact (FONSI). A FONSI allows the project to move forward with final design. During final design, SDOT will continue to work with community members on strategies for mitigating parking impacts, relocating load zones, and other concerns.


Project description
The RapidRide Roosevelt Project (RapidRide J Line) is a partnership between the City of Seattle and King County Metro to implement bus rapid transit serving the neighborhoods from Downtown to Roosevelt.

The purpose of the project is to improve transit travel times, reliability, and capacity to increase high-frequency, all-day transit service and enhance transit connections between Downtown Seattle and five neighborhoods (Belltown, South Lake Union, Eastlake, University District, and Roosevelt).

The project would also improve pedestrian and bicycle connections and access to RapidRide stations and would improve safety for both non-motorized and motorized travelers along the corridor.
If you need this information translated, please call (206) 256-5563.
Si necesita traducir esta información al español, llame al (206) 256-5563.
如果您需要此信息翻譯成中文 請致電 (206) 256-5563.
이 내용의 번역본이 필요하신 경우 (206) 256-5563.
(206) 256-5563 
Environmental Assessment and Section 4(f) Analysis

REVIEW AND COMMENT 
  • Online: www.seattle.gov/Transportation/RapidRideRoosevelt 
  • Drop-in sessions:
    • January 28, 5-9 PM, REI
      222 Yale Ave N, Seattle, WA 98109
    • January 29, 12-4 PM, Starbucks
      2344 Eastlake Ave E, Seattle, WA 98102
    • January 30, 9 AM-12 PM, Starbucks
      6417 Roosevelt Way NE, Seattle, WA 98115 
    • February 1, 9 AM-12 PM, University Family YMCA
      5003 12th Ave NE, Seattle WA, 98105

      *All drop-in locations are ADA accessible.
  • In person or by mail: 
    Darrell Bulmer
    Seattle Department of Transportation
    700 Fifth, Suite 3800 (SMT-38-001) 
    PO Box 34996, Seattle, WA 98124
REVIEW
  • At the following Seattle public libraries: 
    • Central Library 1000 Fourth Ave, Seattle, WA 98104
    • University Branch 5009 Roosevelt Way NE, Seattle, WA 98105
  • By requesting a free CD copy or a hard copy of the Environmental Assessment from RapidRide@seattle.gov. Hard copies of the Environmental Assessment are $25 and each appendix is $15.
Environmental Assessment
The Environmental Assessment evaluated the project’s potential effects and proposed mitigation strategies related to:  
  • Transportation
  • Noise and vibration
  • Socioeconomics
  • Visual and aesthetic resources
  • Stormwater/water quality
  • Hazardous materials
  • Section 4(f) (parks) resources
  • Cultural resources
  • Indirect and cumulative impacts
  • Environmental justice
RapidRide Roosevelt Project area and highlights
Project features:
  • 26 new RapidRide stations (13 per direction of travel) from 3rd Ave to NE 65th St with service to existing stations along 3rd Ave in Downtown Seattle. Stations would be identifiable as part of the RapidRide system and would include a real-time arrival information system display and all-door boarding. Stations would meet Americans with Disabilities Act (ADA) requirements.
  • 33 signalized intersections (including transit signal priority and/or adaptive signals) with 5 transit queue jumps.
  • Approximately 0.2 mile of new transit-only lanes and 2.1 miles of new business access and transit (BAT) lanes, for a total of 2.3 miles of transit lane improvements.
  • Approximately 360 to 410 new overhead contact system (OCS) poles and 3.4 to 3.8 linear miles of overhead wires north of the University Bridge (to power electric trolleybuses) depending on the northern bus turnaround option selected.
  • One new traction power substation (the source of electric power), a potential adjacent utility transformer to control voltage, and an upgraded communications cabinet.
  • A new northern bus layover, where buses would park between runs; this layover area would need to accommodate a maximum of 4 bus spaces.
  • Approximately 5 miles of protected bicycle lanes along 11th/12th Avenues NE, Eastlake Ave E, and Fairview Ave N.
  • New and upgraded sidewalk improvements to meet ADA accessibility requirements including ADA compliant curb ramps and pedestrian push-buttons.
  • Up to approximately 3.4 miles of paving along sections of 11th/12th Avenues NE, Eastlake Ave E, and Fairview Ave N.
  • Ten stormwater detention facilities, with a total capacity of approximately 25,400 cubic feet, are required to meet flow control code requirements per the City of Seattle Stormwater Manual.
Comments on the Environmental Assessment and Section 4(f) Analysis must be postmarked or submitted online by 5 PM on Friday, February 14, 2020.
Want to Stay Informed?
For more information about the project and to sign up for email updates, please visit the RapidRide Roosevelt Project (RapidRide J Line) website at www.seattle.gov/Transportation/RapidRideRoosevelt.
Copyright © *2020* *City of Seattle Department of Transportation*, All rights reserved.

Our mailing address is:
Seattle Department of Transportation, PO Box 34996, Seattle, WA 98124 

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.
 






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
RapidRide Expansion Program · 700 5th Ave · Seattle Municipal Tower · Seattle, WA 98104-5058 · USA

Email Marketing Powered by Mailchimp