Remmel Dam minimum flow release is 300 cfs for January and Febuary.
Remmel Dam will look to release minimum flows for (1/25-1/31). Entergy reserves the right to increase these flows for demand or lake level management.
Degray has a minimum flow of about 150 cfs.
Degray will be scheduled to release increased flows during peak times 8 hours per day on (1/25-1/31).
|