Updated design is now available
In late December 2021, we received approval of minor design changes to Oak Hill Parkway. These design changes occurred to provide better operations for safety and mobility in the corridor, or as a result of utility conflicts. For projects of this size, it’s a standard occurrence to identify design changes that are necessary after further review of the schematic and existing conditions in the corridor.
The adjustments to the design included adding two new bypass lanes for improved non-signalized mobility west of the “Y”, tweaking the shared-use path route through the “Y” interchange, and making operational improvements that enhance safety and mobility for the traveling public.
|