Weather-dependent paving work throughout the corridor
Construction started June 2020 and is expected to continue through 2022.

Please share this email with others who might be interested in receiving project information and construction updates, and feel free to get in touch with us if you have any questions.

You may sign up for email updates using this form.
Translations now available

Para leer esta alerta en Español, visite nuestro sitio web del proyecto

Para basahin ang update na ito sa Tagalog, bisitahin ang aming website para sa proyekto

Để đọc email cập nhật này bằng Tiếng Việt, hãy truy cập trang web dự án của chúng tôi
Maxaad filan kartaa waqtiga dhismuhu socodo
 
REMINDER: Businesses along the corridor are open during this work. Please follow posted detour signs as you visit these businesses.
What to expect the week of September 28
We are currently working in all three zones at the same time, from north to south on Delridge Way SW. As our work zones shift you will see No Parking signs go up towards the southern end of the work zone and parking restored in the northern end of the work zone.

In each of the three work zones, travel lanes will be generally be reduced to one lane in each direction with restricted turns and from time to time you may expect flaggers to be operating one lane at a time. Please follow posted traffic signs.
Anticipated schedule changes due to wet weather this year
This fall, we will continue demolishing and repaving the roadway, driveways and sidewalks throughout the project corridor. Due to the wet weather, we may need to make last minute schedule changes to paving activities which may include delaying paving activities or starting concrete paving pours as the weather allows. The weather-dependent nature of this work may also result in schedule shifts for driveway impacts. Residents will be notified of all schedule changes in advance. Continue reading to learn more about our demolition and paving work zones and schedule.

Please plan for these schedule changes and reach out to us if you have any accessibility concerns during this work. You can learn more about typical paving impacts at the bottom of this email. Thank you for your patience during construction.
Upcoming closures and major work
  • Delayed road closure at SW Oregon St and Delridge Way SW
    • Due to wet weather, we will not be closing SW Oregon St at Delridge Way SW this weekend
    • The first closure of this intersection is now tentatively schedules to take place the weekend of October 2-5 followed by October 9-11.
    • Please note this work is highly weather-dependent and may change
    • Weekend work hours are from Friday morning through Monday morning. The roadway will be open before Monday morning traffic.
    • People traveling on Delridge Way SW will still be able to travel north and south past this intersection
    • People traveling to Delridge Way SW from the closed area will need to detour to SW Andover St via 21st Ave SW. Please refer to the detour map below for more details.
    • Please refer to the King County Metro website for Metro bus detour routes for this closure
  • Curb ramp upgrades on 26th Ave SW at SW Brandon St
    • Beginning next week, we will be upgrading some curb ramps on the northeast side of this intersection
    • Flaggers will be directing traffic through this intersection while we demolish, form and pour new curb ramps
    • This work is expected to last for approximately one week. This work is weather dependent and may change.
SW Oregon St Closure Detour Map
Ongoing closures and work
  • Ongoing major pipework near SW Brandon St
    • Nightwork in this area is complete. Work will continue during regular hours in this area into early October.
    • This work requires us to dig deep in the ground. Please anticipate noise, dust, and vibrations.
  • Continued temporary driveway impacts and closures throughout Zones B and C during roadway and sidewalk upgrades
    • Expect intermittent impacts to driveway access Residents will be notified in advance of any driveway closures
    • We will work our way south in each section and may flip sides on Delridge Way SW. Please continue reading for more details.
Our schedule is subject to change. Please sign up for our text message updates by texting DELRIDGE to 33222 to receive the most up to date information on night work and closures.
If you experience issues with your water service during construction, please contact Seattle Public Utilities’ 24/7 service line at (206) 386-1800.
If you have concerns about accessibility or other impacts of construction, please send us your address, contact information, and concerns so that we can better understand and work together throughout construction. You can reach us at DelridgeTransit@Seattle.gov or call 206-775-8739.
New work by zone
  • Zone A (West Seattle Bridge to SW Findlay St)
    • Continued demolition and paving work on Delridge Way SW (east side)
      • Paving between SW Genesee St and SW Dakota St has been delayed due to some tentative modifications to the roadway design. Paving will resume once the design is finalized and the weather is clear.
      • This work will be loud. You can expect loud hammering, dust, and vibrations during this work.
      • Throughout the rest of the year, we will continue paving the roadway throughout Zone A as we complete demolition work. Please follow signed detours and updated traffic patterns.
    • Upcoming demolition and paving work on the west side of Delridge Way SW
      • We are continuing to demolish and repave the roadway on the west side of Delridge Way SW between SW Edmunds St and SW Hudson St
        • Paving along this stretch will begin as early as next week. Please anticipate schedule changes if there is wet weather in the forecast.
        • Driveways will be closed for up to one week to allow concrete to cure and provide access for crews to work in the area
      • Beginning next week, we will begin demolishing the roadway between SW Hudson St and Puget Blvd SW on the west side
        • We will pour concrete in early October once demolition has been completed. This work is weather-dependent and subject to change.
      • In the next few weeks, we will continue moving south and begin demolishing the roadway between Puget Blvd SW and SW Brandon St
    • Pipework happening between Puget Blvd SW and SW Brandon St
      • Crews will be installing catch basin connections to the stormwater system and adding a line from the existing sewer through early next week. Please contact Seattle Public Utilities at (206) 386-1800 for questions regarding impacts to service.
    • Intersection at SW Oregon St and Delridge Way SW closed for paving the weekends of October 2-5 and October 9-12
  • Zone B (SW Findlay St to north of SW Orchard St)
    • Continued underground work happening near the intersection of SW Graham St and 24th Ave SW. Access will be maintained when work is not occurring.
  • Zone C
    • Through the end of next week, we will continue paving the sidewalks on the west side of the street between SW Thistle St and SW Trenton St
      • Select driveways will need to be closed for up to 3 days as a part of this work. Properties will be notified in advance.
      • This work is weather-dependent and the dates may change
      • Later this fall, we will move to the east side of the street to complete similar work

What to expect during paving 
As we begin paving near residential properties, you may experience impacts to your driveway as we demolish and restore the roadway in front of your property. During this work, you can expect: 

  • Temporary access restrictions in and out of driveways on Delridge Way SW during active demolition. Demolition work is usually limited to a few hours. 
  • Loud hammering, dust and vibrations 
  • During active demolition, onsite crews will be able to provide access to emergency vehicles or for people leaving their homes for emergencies 
  • If you need your car in a timely manner, we recommend parking on side streets. Otherwise, please be prepared for delays and plan to connect with crews onsite to coordinate access. 
  • Steel plates or a gravel ramp will be placed to provide access to the driveways outside of active work hour
  • Up to one week of driveway restrictions as concrete cures directly in front of your property. We will deliver notices to any properties with this impact.
  • Impacted properties will be notified in advance of this work occurring. 
What to expect during construction
Generally, we anticipate working weekdays between 7 AM and 7 PM.  Impacts will include:
  • Noise, dust, and large vehicle traffic
  • Temporary construction parking restrictions for weeks at a time
  • Periodic traffic detours
  • Vehicle lane shifts around work zones
  • Temporary utility service impacts
  • Flaggers to help direct traffic
  • Temporary bus detours and bus stop relocations
As part of this project, we will be upgrading the road condition throughout the corridor. You can expect roadway demolition to look like the photo above.
Project schedule
Stay updated
West Seattle High-Rise Bridge Safety Project
The closure of the West Seattle Bridge has impacted access to the Delridge community and how we all get around. Our Delridge Way SW – RapidRide H Line team is committed to keeping streets open and moving as much as possible and doing everything we can to minimize additional disruptions caused by construction and paving. Learn more about the
West Seattle High-Rise Bridge Safety project and sign up for email alerts to get the latest about the bridge.
 
If you have questions about the West Seattle High-Rise Bridge project, please contact their team by:
Phone: 206-684-7623
Email: 
684-Road@seattle.gov
 If you need this information translated, please call (206) 775-8739.
تحية طيبة, اذا احتجتم لترجمة هذه المعلومات ,الرجاء الاتصال على الرق  206-775-8739 

ይህንን መረጃ እንዲተረጉሙ ከፈለጉ ፣ እባክዎን በሚከተለው ቁጥር (206) 775-8739 ይደውሉ።
Yoo ooddefannon kun akka issinnif hiikammu barbaadan maallo bilbiilla kaanan bilbilla (206) 775-8739.
 
At the City of Seattle, we are continuing to follow guidance from federal, state, and local leaders and our public health partners regarding COVID-19. To keep our crews and the public safe, we have required all contractors to submit updated jobsite Health and Safety Plans to ensure that they comply with the safety and social distancing requirements in the Governor’s Order.
Copyright © 2020 Seattle Department of Transportation, All rights reserved.

Our mailing address is:
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: 206-684-7623


Want to change how you receive these emails?
You can
update your preferences or unsubscribe from this list.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
RapidRide Expansion Program · 700 5th Ave · Seattle Municipal Tower · Seattle, WA 98104-5058 · USA

Email Marketing Powered by Mailchimp