Mosaic mural becomes a reality
Volunteers began the final stage of the Lewes drawbridge mosaic mural project Nov. 4.
Two 25-foot-long sections of mural panels, with each panel measuring 5 feet long and 2 feet high, were screwed into the west side of the bridge. Then, under perfect weather conditions, volunteers worked to blend the panels together to hide the seams and screws.
Two more 25-foot sections will be placed on the east side of the bridge for a total of 100 feet.
Details at capegazette.com/node/211129.
|