Bus stop upgrades, curb work, and demolition and paving activities continue throughout the corridor
Construction started in June 2020 and is expected to continue through 2022.
Translations now available

Para leer esta alerta en Español, visite nuestro sitio web del proyecto

Para basahin ang update na ito sa Tagalog, bisitahin ang aming website para sa proyekto

Để đọc email cập nhật này bằng Tiếng Việt, hãy truy cập trang web dự án của chúng tôi
Maxaad filan kartaa waqtiga dhismuhu socodo
 
Work by zone
Click the links below to learn about work happening in your zone.
Our schedule is subject to change. Please sign up for our text message updates by texting DELRIDGE to 33222  to receive the most up to date information on night work and closures. 
Pedestrian detours during construction
For people walking on the corridor, please look for “Sidewalk Closed” signs and pedestrian detour routes as posted along the corridor. These signs are in place for your safety as we work to upgrade sidewalks along the corridor.
Major construction updates
  • Side street closures on Delridge Way SW during demolition and paving
    • Currently closed:
      • SW Thistle St 
      • SW Myrtle St
      • 20th Ave SW at Delridge Way SW
  • Electrical upgrades along the west side of SW Webster St to Sylvan Way begin soon
    • Trenching and demolition in the sidewalk will begin as early as February 1
    • Sidewalk restoration and paving to begin once utility upgrades are completed
  • Paving and roadway demolition on west side of Delridge Way SW between SW Holden St and SW Kenyon St
    • We will be restoring the roadway where duct bank installation occurred late last year
    • Demolition started this week and will continue into next week
    • Paving is scheduled to begin as early as February 3 and will include roadway, sidewalk, and curb restoration. This work will last for several weeks. 
  • New traffic patterns in Zone B coming soon 
    • We are currently finishing up roadway paving on the west side of Delridge Way SW in Zone B. Once the roadway and curbs have been formed, poured, and cured we will shift traffic to this side. People traveling through this area are encouraged to practice caution as they navigate our work zones.
Work happening this week and next week
For all work described below, residents and businesses will be notified in advance of any anticipated impacts. Dates for construction activities scheduled are subject to change depending upon weather.
  • Zone A (West Seattle Bridge to SW Findlay St)
    • Curb ramps and sidewalks to be installed throughout Zone A for the next few weeks
      • People walking wishing to cross at SW Oregon St via the pedestrian bridge are encouraged to cross at SW Genesee St or SW Alaska St during sidewalk installation
    • Bus stop upgrades on the west side of Delridge Way SW throughout Zone A
      • We are currently planning electrical and concrete work at the southbound bus stop at SW Genesee St
      • Electrical upgrades at the SW Andover St bus stop continue
        • Remaining work at this location is scheduled to begin soon and continue through February 
    • Continued demolition and paving on Delridge Way SW (west side)
      • Paving between Puget Blvd SW and SW Brandon St continues next week
        • Paving continues into next as crews repair damaged roadway panels
        • Access to businesses will be maintained during this work. Only one driveway at businesses will be impacted at any given time.
      • Paving between SW Brandon St to SW Findlay St begins this week
        • Paving is expected to last through next week
           
  • Zone B (SW Findlay St to north of SW Orchard St)
    • Watermain installation and upgrades near SW Juneau St to continue through February
      • We will continue working between SW Findlay St and SW Graham St for several weeks. We will also upgrade and connect pipes on SW Juneau St on both sides of Delridge Way SW.
    • Curb installation continues throughout Zone B
      • As roadway paving is completed on each block, we will return to form and pour curbs throughout Zone B
      • This work has started and will continue for several weeks. Driveways will not be impacted as a result of this work.
      • Please follow posted pedestrian detours and sidewalk closure signs as we complete this work
    • Continued roadway paving on the west side of Delridge Way SW in Zone B
      • Paving is expected to be completed soon
      • Once the concrete has cured, we will flip all traffic to the west side of the street
    • Roadway demolition and paving continues on the east side of Delridge Way SW in Zone B
      • Paving between SW Graham St and 22nd Ave SW will continue through the end of January
      • Demolition between 22nd Ave SW and SW Holly St continues through the week of February 8
        • Once demolition is completed, we will begin paving the roadway
Traffic will be shifted around the completed and active work zones in Zone B. People driving are encouraged to practice caution when traveling through this area. 
  • Zone C (SW Orchard St to SW Roxbury St)
    • Electrical upgrades along the west side of Delridge Way SW between Webster St to Sylvan Way SW
      • Trenching and demolition in the sidewalk will begin as early as February 1
      • Sidewalk restoration and paving to begin the following week 
    • Electrical upgrades on the east side between SW Cloverdale St and SW Trenton continue
      • Paving started this week and will continue through late next week
    • Sidewalk restoration on the west side between SW Kenyon St and SW Thistle St continues
      • This work may be rescheduled due to weather
    • Roadway and sidewalk demolition in Zone C
      • Roadway paving on the west side of Delridge Way SW between SW Henderson and 20th Ave SW continues into next week 
        • Remaining driveway pours will occur as early as February 1 and last for approximately one week. Thank you for your patience. 
      • Paving and roadway demolition on the west side of Delridge Way SW between SW Holden St and SW Kenyon St 
        • We will be working to restore the roadway where duct bank work occurred late last year
        • Demolition continue into early next week
        • Paving is scheduled to begin as early as February 3 and will include roadway, sidewalk, and curb restoration. This work will last for several weeks.
REMINDER: Businesses along the corridor are open during this work. Please follow posted detour signs as you visit these businesses.
If you have concerns about accessibility or other impacts of construction, please send us your address, contact information, and concerns so that we can better understand and work together throughout construction. You can reach us at DelridgeTransit@Seattle.gov or call 206-775-8739.
What to expect during paving and construction
  • Work hours are typically between 7 AM and 7 PM but can last until 10 PM without a noise variance
  • You may experience temporary access restrictions in and out of driveways on Delridge Way SW during active demolition
  • Loud hammering, dust, and vibrations
  • During active demolition, onsite crews will be able to provide access to emergency vehicles of for people leaving their homes for emergencies
  • If you need your car in a timely manner, we recommend parking on side streets. Otherwise, please be prepared for delays and plan to connect with crews onsite to coordinate access.
  • Steel plates or a gravel ramp will be placed to provide access to the driveways outside of active work hours
  • Up to one week of driveway restrictions as concrete cures directly in front of your property. We will deliver notices to any properties with this impact.
  • Vehicle lane shifts around work zones
  • Temporary bus detours and bus stop relocations. Please contact Metro for more information. 
As part of this project, we will be upgrading the roadway throughout the corridor. The road above has recently been demolished. During demolition, access to driveways will be maintained via steel plates or gravel ramps.
West Seattle High-Rise Bridge Safety Program
The closure of the West Seattle Bridge has impacted access to the Delridge community and how we all get around. Our Delridge Way SW – RapidRide H Line team is committed to keeping streets open and moving as much as possible and doing everything we can to minimize additional disruptions caused by construction and paving. Learn more about the
West Seattle High-Rise Bridge Safety program and sign up for email alerts to get the latest about the bridge.
At the City of Seattle, we are continuing to follow guidance from federal, state, and local leaders and our public health partners regarding COVID-19. To keep our crews and the public safe, we have required all contractors to submit updated jobsite Health and Safety Plans to ensure that they comply with the safety and social distancing requirements in the Governor’s Order.

Thanks for reading!

Madison Linkenmeyer
Delridge Transit Outreach Team
delridgetransit@seattle.gov
206-775-8739
Copyright © 2020 Seattle Department of Transportation, All rights reserved.

Our mailing address is:
Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104
Mailing Address: PO Box 34996, Seattle, WA, 98124-4996
Phone: 206-684-7623


Want to change how you receive these emails?
You can
update your preferences or unsubscribe from this list.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
RapidRide Expansion Program · 700 5th Ave · Seattle Municipal Tower · Seattle, WA 98104-5058 · USA

Email Marketing Powered by Mailchimp