Copy
Leading with one innovative solution at a time in HydrodemolitionPile CuttingWire SawingCore DrillingStructural & Robotic Demolition,  
1-281-819-7470
View this email in your browser

VIRGINIA PARALLEL THIMBLE SHOAL TUNNEL PROJECT

The Parallel Thimble Shoal Tunnel is being constructed alongside the Chesapeake Bay Bridge Tunnel which spans the lower Chesapeake Bay, connecting Virginia’s Eastern Shore with the mainland in Virginia Beach.

ATI used hydrodemolition to remove a section of the new Parallel Thimble Tunnel structure. They hydroblasted away an area 300 feet long, 6 feet high, and 6 inches deep. This was done to create space for a new 6-foot-thick concrete slab that would be poured and connected to the existing rebar reinforcement.

During the project's development, engineers anticipated a potential challenge: When the Tunnel Boring Machine would come through the opposite end of the tunnel, the steel rebar within the walls that were poured previously would interfere with the boring process. To overcome this, they engineered fiberglass rebar that was designed to be cut as the drill penetrated through it, while maintaining the structural integrity of the concrete.

ATI successfully handled this challenge by carefully adjusting the pressure of the high-speed water jet used in the hydrodemolition process. This adjustment was crucial to prevent damage to the existing fiberglass rebar, which has different characteristics than traditional steel or ceramic rebar.

Call ATI today for all your hydrodemolition needs: 281-819-7470



Aggregate Technologies' red hydrobot machine is dwarfed by the size of this construction area! (second and third photos)

Project web site: https://www.cbbt.com/tunnel-project/

MASSIVE CONSTRUCTION PROJECT!

Aggregate Technologies has become the preferred specialized concrete demolition contractor for one of the largest construction projects in North America right now. With our excellent safety record, operator training, leadership, and state of the art equipment we are providing Pile Cutting, Wire Sawing, Wall Sawing, Core Drilling, and Hand Sawing. 

Here is a direct testimonial from just one of our clients on site as they refer us to other team members at their corporate office and on other sites:

 “We have ATI out doing some core drilling/saw cutting...and they are doing a great job. They’ve become the subcontractor of choice for our group as they are reliable, have resources available to assist when called on, and have better equipment….” 

We are your Concrete Cutting Experts! Just one call: 281-819-7470. 

The following pictures are representative of the services ATI is providing on this construction project, not the actual project itself.

ABC GREATER HOUSTON FISHING TOURNEY
Matthew Knight and Chris Allen of ATI participated in the Associated Builders and Contractors of Greater Houston’s Annual Tournament. They wade fished in West Bay with the weigh in held at Top Water Grill in San Leon. They placed 6th out of 62 in the guided division, catching red fish, speckled trout and flounder. 

Our team always enjoys being outdoors and being around great people!
(Matthew Knight, far left, Chris Allen, far right)
more fishing...

Aggregate Technologies placed 3rd in the Spaw Glass 2023 CJ Strnadel IV Memorial Fishing Tournament and donated their $1000 prize winnings back to the cause!

(Chris Allen, far left, Matthew Knight, far right)
RECLAIMING CONSTRUCTION SITE WATER & HYDRODEMOLITION

Aggregate Technologies Hydrodemolition technology saves the rebar when removing concrete.

Now, ATI can reclaim and save water when using hydrodemolition or other concrete removal technologies. In a recent job we were able to get the pH back to 7, better than before!
What the video on YouTube or LinkedIn
  • Eco-friendly 
  • Automated
  • Portable
  • Able to neutralize the elevated alkaline pH levels to range 6-9.
  • Able to offer a full control of turbidity down to 20-40 mg particles per liter
  • Treats up to 88 GPM!
  • Recycle water for reuse
 

 WE ARE HIRING! 
Do you know a high school graduate that isn't planning on attending college? Tell them about the career opportunities at Aggregate Technologies

  • Starting pay $18hr
  • Comprehensive Training Program & Path Forward to Success
  • 90 days $1hr raise
  • $2000 incentive once in the field unsupervised
  • Yearly Raises
  • Paid Health Insurance
  • 401k Matching
  • 2 weeks Paid PTO
  • Family Culture
  • No College Debt Required!

Watch this video and read why the project engineer specified Hydrodemolition!
Selected ATI projects:
We have patented two concrete cutting machines and won multiple national safety awards. You can make your next project a success by calling 1-281-819-7470 or emailing sales@aggregatetechnologies.com
We look forward to working with you, and making you and your projects a success. Contact us at 1-281-819-7470 or sales@aggregatetechnologies.com
Copyright © 2023 Aggregate Technologies, Inc, All rights reserved.


Call us: 1-281-819-7470  

unsubscribe from this list    update subscription preferences